Harris Academy, Beckenham is a new, state of the art academy, providing an ‘outstanding’ learning environment for primary, secondary and sixth form students.
FBS Contracts Manufactured and installed furniture for 88 rooms, including:
We worked closely with the architects and end users to provide furniture that was both functional and aesthetic. Trespa Toplab Base was the primary worktop surface used in specialised classrooms such as Art, Textiles and Science. Whilst laminated worktops provided a fresh finish to the ICT, Graphics and technology write up areas.
The science labs included satin anodised gas & water taps throughout and our service bollards combined with loose tables allow for a versatile and adjustable layout.
We also designed, manufactured and installed a bespoke reception desk, all post-formed laminated construction with a linoleum desk, incorporating an access hatch, raised writing shelf and DDA access.
FBS Contacts
Submit your enquiry to our supportive team.